×

Archives

  • June 2026
  • May 2026
  • March 2026
  • February 2026
  • January 2026
  • December 2025
  • November 2025
  • September 2025
  • July 2025
  • June 2025
  • May 2025
  • April 2025
  • March 2025
  • February 2025
  • January 2025
  • December 2024
  • November 2024
  • October 2024
  • August 2024
  • July 2024
  • June 2024
  • May 2024
  • April 2024
  • March 2024
  • February 2024
  • January 2024
  • December 2023
  • November 2023
  • October 2023
  • September 2023
  • August 2023
  • July 2023
  • June 2023
  • May 2023
  • April 2023
  • March 2023
  • February 2023
  • January 2023
  • December 2022
  • November 2022
  • October 2022
  • September 2022
  • August 2022
  • July 2022
  • June 2022
  • May 2022
  • April 2022
  • December 2021
  • November 2021
  • March 2021
  • February 2021
  • November 2020
  • November 2016
  • October 2016
  • September 2016
  • August 2016

Categories

  • Formwork
  • Law
  • Logistic
  • Uncategorized

SIGN IN YOUR ACCOUNT TO HAVE ACCESS TO DIFFERENT FEATURES

FORGOT YOUR PASSWORD?

FORGOT YOUR DETAILS?

AAH, WAIT, I REMEMBER NOW!

digvijayamclinic

  • SUPPORT
  • LOGIN
  • HOME
  • COMPANY
  • Contact
REQUEST A QUOTE
  • Home
  • 2022
  • Page 4

Year: 2022

  • 0
admin
Saturday, 23 April 2022 / Published in Formwork

Plastic Shuttering – The new trend in Construction

Plastic Shuttering – The new trend in Construction

Formworks are temporary moulds into which concrete or similar materials are poured. In the context of concrete construction, the falsework supports the shuttering moulds. In the past aluminium, steel and timber formworks were used but they have their own disadvantages. The construction of formwork takes time and involves the expenditure of up to 20 to 25% of the cost of the structure or even more. 

Formwork systems are among the key factors determining the success of a construction project in terms of speed, quality, cost and safety of the works. Nowadays, most projects are required by the client to complete in the shortest time possible as a means to minimize costs with safety. Plastic formwork systems have been creating a buzz in recent times with their advantages including flexibility, durability and cost-effectiveness.

Plastic Formwork in India is a crucial part of the construction industry, it is used as a mould for a structure. Into this mould, fresh concrete is placed so that it can gain enough strength. The Design of these temporary structures is made for economic expenditure. The operation of removing the formwork is known as de-shuttering. 

Conventional formwork made of wood, steel and aluminium bore many detriments, which outweighed the benefits. Wood consumption has a huge and massive environmental impact- deforestation and high price. Moreover, compared to the reusability of plastic, it is very less. Although the reusability index of aluminium forms is satisfactory, the cost factor makes it an unworthy choice. We at Nova Formworks take pride in our plastic formworks, why not try it for your next project?

  • 0
admin
Sunday, 17 April 2022 / Published in Formwork

Let’s Get Into The Details Of Column Formwork!

Let’s Get Into The Details Of Column Formwork!

Formwork is an important part of the construction industry. Column formwork has evolved in the years with so many different types and materials. Column formwork is shaped and sized to the needs of a project, it can be either square or round-shaped. In order to help facilitate quality control during the pouring stage of using column formwork, clamps, which are horizontal and made of either steel or timber are often used in conjunction with column molds. Column formwork’s head is frequently employed to support beam formwork, or column formwork is cast to the bottom side of beams. The use of column formwork in conjunction with beam formwork allows for quick and precise construction.

Two of the major benefits of using column formwork include that it is quick and simple to assemble and that it reduces the amount of labour and equipment needed to successfully produce uniform and strong vertical concrete shapes of desired dimensions. 

Column formwork is used in any type of building construction, retail building construction, residential building construction, industrial construction, bridge construction, power plant construction, infrastructure construction, and sewage treatment plant construction, to name a few areas where it’s applicable. 

Once the concrete sets in column formwork, it is necessary that it is thoroughly inspected to ensure it meets the necessary standards of the project in terms of factors such as appearance and strength. As concrete is being poured, column formwork is often bolstered with the help of falsework. Falsework includes poles or other stabilizing elements that keep the column formwork in place until the concrete dries.

Currently, plastic formworks are the best in the construction industry. They can be reused 100 times and are completely eco-friendly. Nova Formworks is known for its plastic formworks, so what are you waiting for? Let’s reach the height of construction with Nova Formworks.

  • 0
admin
Wednesday, 13 April 2022 / Published in Formwork

How Are Drain Formworks Used?

How Are Drain Formworks Used?

The formwork used when building concrete structures has a significant influence on the quality of the concrete’s surface because it imprints its own texture. The poor quality of formed concrete surfaces is a problem that is widespread in civil engineering and architectural works. In addition to creating an esthetic problem, this irregularity of the surface renders it more vulnerable to elements in the immediate environment. This phenomenon is even more common with structures exposed to harsh weather.

When pouring concrete, the operation which consists of uniformly spreading the mix inside the formwork through the use of vibrations leads to a migration of excess water to the surface, which weakens the primary layer. Often watertight, the formwork does not allow for the drainage of bleeding water that remains on the periphery.

Drainaform is composed of a single textile layer with two different surfaces. The smooth side, which is in contact with the concrete, serves as a filter and prevents the washout of fine cement particles. The fibrous side acts as a drainage component to remove excess surface water and air. Helping to maintain the water-cement ratio and minimize laitance problems, it also helps to improve the strength and durability of the top concrete layer, in addition to giving it a more uniform appearance. In short, Drainaform helps to effectively protect the concrete against aggressive elements such as water, de-icing salts, and freeze-thaw cycles.

Nova Formworks provides the best quality drain formworks. We are known to be one of the best Formworks providers in the industry, this company’s inception dates back to 2004. Connect with us for your next mega project.

  • 0
admin
Tuesday, 12 April 2022 / Published in Formwork

Useful Construction Tips for Concrete Column Formwork

Useful Construction Tips for Concrete Column Formwork

To retain the concrete shuttering tightly in proper position and for correct arrangement, a concrete pad known as a starter is cast before settling the formwork. The density will be approximately 45 mm to 60 mm and the dimensions will be exactly equivalent to the dimensions of the projected column. The starter is to be cured for a day or 2 so that it becomes strong to set the shuttering around it. Formworks for columns are formed with plastic, plywood sheets or steel sheets fabricated with plenty of stiffeners.

A thin film of oil or grease should be included with the inner surface of the formwork so that the column can be detached smoothly once the concrete gets solidified. Shuttering should be arranged perfectly and vertical. The diagonals should be examined to verify whether the dimensions are correct.

Formwork should be comprehensively supported with props size before pouring the concrete to resist its movement horizontally or vertically throughout concreting. The gaps close to the shuttered joints should be sealed so that there is no leakage of slurry. Column formwork is shaped and sized to the needs of a project. In order to help facilitate quality control during the pouring stage of using column formwork, clamps that are horizontal and made of either steel or timber are often used in conjunction with column moulds. Column formwork’s head is frequently employed to support beam formwork, or column formwork is cast to the bottom side of beams. The use of column formwork in conjunction with beam formwork allows for quick and precise construction.

Appropriate space should be arranged in the inside face of the shutter and reinforcement by setting up cover blocks of about 40mm. The formworks should be detached after a day of casting and if it is required to detach them previously, they should be kept up to at least sixteen hours.

Two of the major benefits of using column formwork include that it is quick and simple to assemble and that it reduces the amount of labour and equipment needed to successfully produce uniform and strong vertical concrete shapes of desired dimensions. Choose Nova Formworks and use the next generation of shuttering.

  • 0
admin
Friday, 01 April 2022 / Published in Formwork

Buy the best price plastic formwork for concrete construction

Buy the best price plastic formwork for concrete construction

Now and then there is a boom in technology in every industry. Plastic formworks are one of them in the construction industry. The use of plastic formworks for concrete construction has many advantages such as durability, cost, and flexibility compared to other materials for concrete formworks. Plastic formworks are used to hold freshly placed concrete at its position until it attains enough strength and with the help of formworks concrete can be easily manipulated and various shapes and forms can be constructed. 

There are different materials that may be used to manufacture formworks for example timber, steel, and aluminium in addition plastic offers several advantages compared to other materials, for example, it is mouldable and flexible. It is reported that not only does the construction of formworks takes time but also spent about 20 to 25% of the total cost of the structure. It is one of the major factors that influence the success of the construction of any structure in terms of safety, cost, quality, and speed. It is for these advantages and benefits of plastic forms that it is Nova Formworks best selling product.

Buy these plastic formworks at the best price from Nova Formworks and use them 100+ times. Planning and material requirements are simplified with plastic formworks. This formwork is continuously adjustable and has many advantages that can be widely used in the construction field.

Nova provides the patented unique locking mechanism. They will fit perfectly adjacent to each other without any concrete leakage. No specific tools are required for shuttering and dismantling of the formwork. 

Advantages of plastic formwork:

  • It can be used more than 100 times.
  • The panels of this formwork are lightweight, sturdy, and easier to handle and manage.
  • It is easy to clean this form with water as the concrete does not stick to it.
  • Plastic formwork does not require shuttering oil as the surface tension is low.
  • It will not damage when getting in contact with the water and no rusting problem as well.
  • The panels of these formworks can be locked by a locking handle to ensure that no lick age of concrete during the construction. The locking system is very easy and accurate.
  • 1
  • 2
  • 3
  • 4

Recent Posts

  • Construction Challenges in Monsoon
  • Why Modular Formwork Is the Future of Fast-Track Construction Projects
  • Where Construction Projects Actually Lose Time (And How to Fix It)
  • How to Improve Construction Site Safety with Better Formwork Systems?
  • Why Your Construction Site Feels Busy but Still Falls Behind Schedule?

Recent Comments

  1. A WordPress Commenter on Hello world!

Recent Posts

  • Construction Challenges in Monsoon

    Every year between June and September, India&#8...
  • Why Modular Formwork Is the Future of Fast-Track Construction Projects

    Why Modular Formwork Is the Future of Fast-Trac...
  • Where Construction Projects Actually Lose Time (And How to Fix It)

    Where Construction Projects Actually Lose Time ...
  • How to Improve Construction Site Safety with Better Formwork Systems?

    How to Improve Construction Site Safety with Be...
  • Why Your Construction Site Feels Busy but Still Falls Behind Schedule?

    Why Your Construction Site Feels Busy but Still...

Recent Comments

  • A WordPress Commenter on Hello world!

Archives

  • June 2026
  • May 2026
  • March 2026
  • February 2026
  • January 2026
  • December 2025
  • November 2025
  • September 2025
  • July 2025
  • June 2025
  • May 2025
  • April 2025
  • March 2025
  • February 2025
  • January 2025
  • December 2024
  • November 2024
  • October 2024
  • August 2024
  • July 2024
  • June 2024
  • May 2024
  • April 2024
  • March 2024
  • February 2024
  • January 2024
  • December 2023
  • November 2023
  • October 2023
  • September 2023
  • August 2023
  • July 2023
  • June 2023
  • May 2023
  • April 2023
  • March 2023
  • February 2023
  • January 2023
  • December 2022
  • November 2022
  • October 2022
  • September 2022
  • August 2022
  • July 2022
  • June 2022
  • May 2022
  • April 2022
  • December 2021
  • November 2021
  • March 2021
  • February 2021
  • November 2020
  • November 2016
  • October 2016
  • September 2016
  • August 2016

Categories

  • Formwork
  • Law
  • Logistic
  • Uncategorized

Meta

  • Log in
  • Entries feed
  • Comments feed
  • WordPress.org

Search

Recent Posts

  • Construction Challenges in Monsoon

    Every year between June and September, India&#8...
  • Why Modular Formwork Is the Future of Fast-Track Construction Projects

    Why Modular Formwork Is the Future of Fast-Trac...
  • Where Construction Projects Actually Lose Time (And How to Fix It)

    Where Construction Projects Actually Lose Time ...
  • How to Improve Construction Site Safety with Better Formwork Systems?

    How to Improve Construction Site Safety with Be...
  • Why Your Construction Site Feels Busy but Still Falls Behind Schedule?

    Why Your Construction Site Feels Busy but Still...

Recent Comments

  • A WordPress Commenter on Hello world!

Archives

  • June 2026
  • May 2026
  • March 2026
  • February 2026
  • January 2026
  • December 2025
  • November 2025
  • September 2025
  • July 2025
  • June 2025
  • May 2025
  • April 2025
  • March 2025
  • February 2025
  • January 2025
  • December 2024
  • November 2024
  • October 2024
  • August 2024
  • July 2024
  • June 2024
  • May 2024
  • April 2024
  • March 2024
  • February 2024
  • January 2024
  • December 2023
  • November 2023
  • October 2023
  • September 2023
  • August 2023
  • July 2023
  • June 2023
  • May 2023
  • April 2023
  • March 2023
  • February 2023
  • January 2023
  • December 2022
  • November 2022
  • October 2022
  • September 2022
  • August 2022
  • July 2022
  • June 2022
  • May 2022
  • April 2022
  • December 2021
  • November 2021
  • March 2021
  • February 2021
  • November 2020
  • November 2016
  • October 2016
  • September 2016
  • August 2016

Categories

  • Formwork
  • Law
  • Logistic
  • Uncategorized

Meta

  • Log in
  • Entries feed
  • Comments feed
  • WordPress.org

Ready to Transform Your Business?

Let's discuss how we can help you achieve profit, progress, and prosperity. Schedule your free consultation today.

Consult On WhatsApp

About Holistique Business Consulting Pvt. Ltd.

Holistique Business Consulting Pvt. Ltd. acts as a profit catalyst to business of any size and dimensions. It lays out pathway to - Profit, Progress and Prosperity - of Business Owners and Entrepreneurs. We acknowledge uniqueness of every type of business.

CUSTOM MENU

  • Ground Delivery
  • Air Delivery
  • Sea Delivery
  • Terms and Conditions
  • Customer Care

CUSTOM MENU

  • Ground Delivery
  • Air Delivery
  • Sea Delivery
  • Terms and Conditions
  • Customer Care

COMPANY INFO

Monday - Friday 09.00 - 18.00

+91 9999 424 420

info@holis-tique.com

WE'RE SOCIAL

TOP