×

Archives

  • June 2026
  • May 2026
  • March 2026
  • February 2026
  • January 2026
  • December 2025
  • November 2025
  • September 2025
  • July 2025
  • June 2025
  • May 2025
  • April 2025
  • March 2025
  • February 2025
  • January 2025
  • December 2024
  • November 2024
  • October 2024
  • August 2024
  • July 2024
  • June 2024
  • May 2024
  • April 2024
  • March 2024
  • February 2024
  • January 2024
  • December 2023
  • November 2023
  • October 2023
  • September 2023
  • August 2023
  • July 2023
  • June 2023
  • May 2023
  • April 2023
  • March 2023
  • February 2023
  • January 2023
  • December 2022
  • November 2022
  • October 2022
  • September 2022
  • August 2022
  • July 2022
  • June 2022
  • May 2022
  • April 2022
  • December 2021
  • November 2021
  • March 2021
  • February 2021
  • November 2020
  • November 2016
  • October 2016
  • September 2016
  • August 2016

Categories

  • Formwork
  • Law
  • Logistic
  • Uncategorized

SIGN IN YOUR ACCOUNT TO HAVE ACCESS TO DIFFERENT FEATURES

FORGOT YOUR PASSWORD?

FORGOT YOUR DETAILS?

AAH, WAIT, I REMEMBER NOW!

digvijayamclinic

  • SUPPORT
  • LOGIN
  • HOME
  • COMPANY
  • Contact
REQUEST A QUOTE
  • Home
  • 2021
  • March

Month: March 2021

  • 0
admin
Wednesday, 10 March 2021 / Published in Formwork

Learn About MIVAN Aluminium Formwork

Learn About MIVAN Aluminium Formwork

Today, numerous real estate developers use Mivan technology as it ensures the durability of the structure. It is the crucial factor that makes it an ideal choice for the construction of several houses in a short duration. It is worth noting that Mivan shuttering could leave behind the old-style ways of construction.   

Mivan Formwork

Mivan shuttering/ formwork refers to an aluminium formwork system. It is unique as well as an advanced technique of construction that provides speed without deteriorating durability or strength. It is an economical variant of the old-style construction method that is time-taking as well as labour-intensive.

It is an ideal method of construction for larger projects as all the components such as slabs, beams, staircases, walls, etc. are made from concrete. Just like the modular kitchens replaced traditional kitchens offering aesthetic appeal and great space efficiency, Mivan formwork helped with easy assembling as well as quicker construction.

Advantages of Mivan Formwork

The key benefit of Mivan formwork is that it helps fasten the construction’s speed as well as yields better construction quality. The formwork is lightweight which makes it easier for labour to handle it. The number of the joints is less, therefore, it requires low maintenance. It is important to note that the shuttering has a fixed set of procedures, therefore, you do not require skilled labour for the installation.

As the surfaces are smooth, it offers a natural aesthetic and there is no need for plastering. The less cost of fabrication results in less debris generation. The best thing is that you can use it nearly hundreds of times because aluminium does not have the problem of corrosion. And, it is resistant to seismic forces as well. 

Work Cycle 

Here are the keys steps involved in the work cycle of the Mivan shuttering

  • On the first day, there would be the erection of the vertical reinforcement bars as well as one side of formwork for the part of one floor.
  • On the second day, there would be the erection of another side of vertical formwork as well as the floor’s formwork. 
  • On the third day, labour would fix the reinforcement bars for the floors as well as cast the slabs and wall. 
  • On the fourth day, the labour would remove the panels of vertical formwork once the 24 hours are complete. They would leave the props in place for nearly 7 days and the floor slab formwork for 2.5 days.

This way construction happens quickly. In case you are planning to invest in Mivan formwork, Nova Form Works makes an ideal choice. We have experienced engineers and they can assist you with proper guidance for your construction project and requirements.

  • 0
admin
Wednesday, 10 March 2021 / Published in Formwork

How Formwork Is Important in Construction

How Formwork Is Important in Construction

Undoubtedly, construction has become the base of modern civilisation. Construction has enabled the people to grow by offering the means essential to make life easy and comfortable whether it is a house, building, roads, bridges, etc. Modern technology played a vital role in the industry of construction. It has increased efficiency as well as speed incredibly and reduced costs also. 

Moreover, the materials used in construction now are flexible, durable and stronger, allowing for sustainable structures that are environmentally friendly and safe. Among the crucial factors that result in high-quality concrete construction is the formwork. 

Formwork

Formwork refers to an ancillary construction in which permanent or temporary moulds are used. The fresh concrete is poured into the moulds that harden subsequently. Depending on the budget of the project as well as the purpose of the structure, the type of formwork is used. The list of common materials used for formwork construction includes steel, fabric, aluminium, plastic, etc. 

Importance of Formwork

The use of formwork in construction has brought several benefits that cannot be substituted with any other technology. Here are a few advantages

  • In the construction industry, the safety of the workers is supreme. The formwork gives adequate access as well as working platforms that ensure the worker’s safety during a construction job. Along with this, formwork ensures the project’s structural safety by giving custom solutions against the overlaid loads that produce safe as well as sustainable structures.
  • Another advantage is time-saving. By lessening the floor-to-floor construction time, formwork helps to reduce the time of project construction. Moreover, formwork plays a crucial role in meeting budget requirements as well as reducing costs. The use of formwork aids project managers to facilitate formwork resource’s on-time mobilization as well as demobilisation that further reduces cost and increases efficiency. 
  • It is worth noting that it is expensive to repair the defective concrete finishing. The quality of formwork used at the time of construction influences the concrete structure’s surface finishing. Using an appropriate formwork system eliminates the requirement of plastering for any RRC (roller compacted concrete surface).

Opting for high-quality formwork would help you get a durable as well as sturdy structure. If you are searching for a reliable source for getting quality formwork, Nova Form Works is the best search result. We have a team of engineers who would assist across all the stages of the project. They would assist you with the installation of formwork as well as provide training on-site.  

  • 0
admin
Wednesday, 10 March 2021 / Published in Formwork

All About Wall Formwork and Panels Formwork Systems for Walls

All About Wall Formwork and Panels Formwork Systems for Walls

Concrete is one of the crucial materials that is widely used for construction. The reason that makes this material a popular choice is its exceptional properties. However, it is necessary to pour concrete into a specifically designed mold to create the building elements with it. And, that mold is known as shuttering or formwork.

Formwork for Concrete Wall

Formwork refers to temporary structures that support the complete or part of a permanent structure until it sets. As the concrete is quite heavy, the formwork needs to be constructed solidly as well as braced and supported firmly. Before pouring concrete forms need to be oiled well so that there is easy removal for formwork once the concrete is dried. 

Normally, formwork for the wall is built upon each side of the wall. Before placing spreaders and tying the wall, the experts lay reinforcement bars on the wires. After that, they brace the studs that are nearly 600mm apart. For fixing the wall formwork, there are two methods 

  • Formwork Without Wales: In this method, the sheeting is prepared in the panel’s size that is convenient to handle. The sheeting is placed in between the rows of studs. To hold and keep the sheeting with the spreaders at the correct distance, wire ties are used. 
  • Formwork Using Wales: In case there is a risk of wall formworks getting a bit out of line, then using wales is advised. In this method, horizontal wales are bolted through each side of to stud to fix that. To keep the sheeting at an appropriate distance apart, there is a need for spacing pieces. As bolts need to be removed later, it is crucial to grease them properly before pouring concrete. 

Material for Wall Formwork

Wall formwork is an ideal choice for different types of vertical applications such as retaining walls, water tanks, lift wall rafts, shear walls, etc. Numerous materials used for formwork include steel, aluminium, fabric, plastics, etc. Out of these choices, plastic fabricated formworks are quite popular. And, the reason behind the popularity of plastic formworks is that they are lightweight as well as easy to handle. They offer resistance against water and are durable for longer periods. 

The best thing about these formworks is that they make the ideal choice for ideal choice for complex-shaped structures. If you wish to get plastic wall formwork, Nova Formworks is the best place. We provide wall formwork in a variety of panel sizes that helps in making the supportive verticals as well as walls.

  • 0
admin
Wednesday, 10 March 2021 / Published in Formwork

Why Should You Choose Plastic Beam Formwork?

Why Should You Choose Plastic Beam Formwork?

Traditionally, the panels and molds made of timber are used for construction. However, the plywood or timber has lesser repetition and the waste generated from them is non-recyclable resulting in piles of debris. Moreover, it requires skilled labor to install as well as dismantle the structure which leads to extra labor costs. Therefore, the ideal alternative to this is plastic formwork that would help you get better results. 

Benefits of Using Plastic Formwork

The construction of beam formwork requires time as well as it spends nearly 20 to 25% of the structure’s cost. It is one of the key factors that influence that construction’s success in terms of cost, speed, quality, and safety. Using the formworks made from plastic helps to reduce the setting time. The best thing is that the formworks are easy to fix as well as remove once the concrete gets strong. The list of common benefits of plastic formworks include

  • Leakage: One of the major factors that require attention in the construction of structures is leakages. In formwork, leakages could result in segregation. It tends to cause a honeycomb in the structure. However, with the use of plastic formwork, you can prevent water as well as fresh concrete leakages. 
  • Cleaning: Another significant factor is the cleaning of the formwork. As the formworks are large in numbers, it could be hard to clean them properly. It requires a good amount of time as well as more manpower for the cleaning task. However, cleaning the plastic formwork is easier in comparison to other types of formwork. Using water, you can clean them properly and save a lot of time. 
  • Oiling and Nailing: When project contractors use the formwork made from wood or steel, they need to oil that. And, that sets by nailing. However, when the use of plastic formwork does not require nailing or oiling plates. The plugging system’s auto-leveling makes the level of the plate. Moreover, it takes less time the installing as well as dismantle. 
  • Labour-Friendly: One of the best things that make plastic formworks the right choice is that they are labor-friendly. In comparison to other formwork systems, these are lightweight and fit and well as plugged easily.

Apart from these, another advantage is that they are made from high-grade plastics. No material sticks to these formworks. Therefore, no chemical reaction would occur between the plastic and the material poured in. Moreover, there would be no scratches on the surface. If you wish to get formworks of high-quality for your construction project, Nova Form Works is the best choice. We provide plastic formwork for all types of verticals, beams, and columns.

Recent Posts

  • Construction Challenges in Monsoon
  • Why Modular Formwork Is the Future of Fast-Track Construction Projects
  • Where Construction Projects Actually Lose Time (And How to Fix It)
  • How to Improve Construction Site Safety with Better Formwork Systems?
  • Why Your Construction Site Feels Busy but Still Falls Behind Schedule?

Recent Comments

  1. A WordPress Commenter on Hello world!

Recent Posts

  • Construction Challenges in Monsoon

    Every year between June and September, India&#8...
  • Why Modular Formwork Is the Future of Fast-Track Construction Projects

    Why Modular Formwork Is the Future of Fast-Trac...
  • Where Construction Projects Actually Lose Time (And How to Fix It)

    Where Construction Projects Actually Lose Time ...
  • How to Improve Construction Site Safety with Better Formwork Systems?

    How to Improve Construction Site Safety with Be...
  • Why Your Construction Site Feels Busy but Still Falls Behind Schedule?

    Why Your Construction Site Feels Busy but Still...

Recent Comments

  • A WordPress Commenter on Hello world!

Archives

  • June 2026
  • May 2026
  • March 2026
  • February 2026
  • January 2026
  • December 2025
  • November 2025
  • September 2025
  • July 2025
  • June 2025
  • May 2025
  • April 2025
  • March 2025
  • February 2025
  • January 2025
  • December 2024
  • November 2024
  • October 2024
  • August 2024
  • July 2024
  • June 2024
  • May 2024
  • April 2024
  • March 2024
  • February 2024
  • January 2024
  • December 2023
  • November 2023
  • October 2023
  • September 2023
  • August 2023
  • July 2023
  • June 2023
  • May 2023
  • April 2023
  • March 2023
  • February 2023
  • January 2023
  • December 2022
  • November 2022
  • October 2022
  • September 2022
  • August 2022
  • July 2022
  • June 2022
  • May 2022
  • April 2022
  • December 2021
  • November 2021
  • March 2021
  • February 2021
  • November 2020
  • November 2016
  • October 2016
  • September 2016
  • August 2016

Categories

  • Formwork
  • Law
  • Logistic
  • Uncategorized

Meta

  • Log in
  • Entries feed
  • Comments feed
  • WordPress.org

Search

Recent Posts

  • Construction Challenges in Monsoon

    Every year between June and September, India&#8...
  • Why Modular Formwork Is the Future of Fast-Track Construction Projects

    Why Modular Formwork Is the Future of Fast-Trac...
  • Where Construction Projects Actually Lose Time (And How to Fix It)

    Where Construction Projects Actually Lose Time ...
  • How to Improve Construction Site Safety with Better Formwork Systems?

    How to Improve Construction Site Safety with Be...
  • Why Your Construction Site Feels Busy but Still Falls Behind Schedule?

    Why Your Construction Site Feels Busy but Still...

Recent Comments

  • A WordPress Commenter on Hello world!

Archives

  • June 2026
  • May 2026
  • March 2026
  • February 2026
  • January 2026
  • December 2025
  • November 2025
  • September 2025
  • July 2025
  • June 2025
  • May 2025
  • April 2025
  • March 2025
  • February 2025
  • January 2025
  • December 2024
  • November 2024
  • October 2024
  • August 2024
  • July 2024
  • June 2024
  • May 2024
  • April 2024
  • March 2024
  • February 2024
  • January 2024
  • December 2023
  • November 2023
  • October 2023
  • September 2023
  • August 2023
  • July 2023
  • June 2023
  • May 2023
  • April 2023
  • March 2023
  • February 2023
  • January 2023
  • December 2022
  • November 2022
  • October 2022
  • September 2022
  • August 2022
  • July 2022
  • June 2022
  • May 2022
  • April 2022
  • December 2021
  • November 2021
  • March 2021
  • February 2021
  • November 2020
  • November 2016
  • October 2016
  • September 2016
  • August 2016

Categories

  • Formwork
  • Law
  • Logistic
  • Uncategorized

Meta

  • Log in
  • Entries feed
  • Comments feed
  • WordPress.org

Ready to Transform Your Business?

Let's discuss how we can help you achieve profit, progress, and prosperity. Schedule your free consultation today.

Consult On WhatsApp

About Holistique Business Consulting Pvt. Ltd.

Holistique Business Consulting Pvt. Ltd. acts as a profit catalyst to business of any size and dimensions. It lays out pathway to - Profit, Progress and Prosperity - of Business Owners and Entrepreneurs. We acknowledge uniqueness of every type of business.

CUSTOM MENU

  • Ground Delivery
  • Air Delivery
  • Sea Delivery
  • Terms and Conditions
  • Customer Care

CUSTOM MENU

  • Ground Delivery
  • Air Delivery
  • Sea Delivery
  • Terms and Conditions
  • Customer Care

COMPANY INFO

Monday - Friday 09.00 - 18.00

+91 9999 424 420

info@holis-tique.com

WE'RE SOCIAL

TOP